This complex and challenging project is now handed over after an 18-month collaboration.
The project included:
- The installation of a new 3 number 2.5MW dual fuel LPHW Boilers.
- Replacement of the Operating Theatre Air Handling Units (x12).
- The installation of a district heating network.
- Replacement of all steam heat exchangers with LPHW heat exchangers.
- A 2MW Combined heat and power plant.
- A new 400V / 10kV Transformer.
- The full refurbishment of 4 satellite boiler plantrooms.